Skip to main content Skip to home page

For water and sewerage infrastructure, we follow Water Services Association of Australia's (WSAA) Codes to meet industry specifications and Victorian regulations.

The planning, design, construction, testing and commissioning of drinking water and non-drinking water supplies must adhere to:

Disinfection or sampling of water mains must be carried out by a registered Water Mains Disinfection Contractor (PDF 106KB).

The planning, design and construction of trunk, branch and reticulation sewers as well as maintenance structures must adhere to:

The planning, design and construction of pumping stations and pressure mains must adhere to:

The Melbourne Retail Water Agencies (MRWA) web portal provides a checklist of makes and models for site and plant equipment.

The products tab allows you to refine a search by ticking Coliban Water to search for all products we accept.

GIS Spatial Data Specification provides guidance for all spatial data submissions including survey data capture, and instructions for submission of “As Constructed” information.

View our ACDC Submission Process here.

Consultants that provide professional services for the design, contract administration and construction, associated with assets installed by developers are required to be approved and registered by Coliban Water.

Consultants can find all the resources relating to planning and construction here.

Last updated on 08 Aug 2023
Back to top