From July 1 2015, plumbers are required to arrange inspections of recycled water connections directly with Coliban Water. (The R1, R2 and R3 inspections were previously booked with and conducted by the VBA.)

R1 – Meter to house inspections must be booked by the plumber and will be inspected at random by a Coliban Water representative.

R2 - ‘Rough in’ inspections must be booked by the plumber and will be inspected at random by a Coliban Water representative.

R3 – Commissioning inspections are mandatory for all recycled water connections and must be booked directly with Coliban Water.


You must adhere to the 'Conditions of connection for dual pipe areas within Coliban Water'.